HomeSolar costsGuidesFAQContact

HOMEOWNER CHECKLIST — JULY 2026

Solar Installer Red Flags

Check the business, quote, equipment, electrical work and handover documents before you release the final payment.

A review is a signal, not proof.

Public complaints can identify questions worth asking, but a single review does not establish a pattern or prove misconduct. Verify documents and registrations directly, get commitments in writing and assess multiple recent sources.

Before accepting a quote

Red flags in the quote

Red flagWhat to request instead
“5 kW inverter” with no make or modelExact manufacturer, model number, datasheet and approved-substitution process.
Battery listed only by nominal capacityExact model, usable capacity, warranty terms, cycle assumptions and BMS compatibility.
Panels listed without quantity or modelPanel model, wattage, quantity, string layout, mounting system and roof area.
“Installation included” with no scopeItemised protection, cabling, isolators, mounting, labour, commissioning, monitoring and remedial work.
No paperwork line itemWritten responsibility for the electrical CoC, test report and any applicable SSEG submission or update.
Guaranteed savings or runtime without calculationsAssumptions based on measured consumption, usable storage, system losses and local solar yield.

Payment red flags

Payment schedules vary. The safer principle is to link payments to verifiable milestones and retain an agreed final portion until commissioning and required handover documents are complete.

Installation-day red flags

Do not close the job without a handover pack

  1. Final itemised invoice and installed equipment/serial-number list.
  2. Electrical Certificate of Compliance and associated test documentation for the work.
  3. Applicable municipal or utility submission records, where required.
  4. Inverter, battery and panel warranty documents.
  5. System settings, shutdown/start-up procedure and monitoring access.
  6. Workmanship warranty and a documented support/escalation route.

How to check the CoC process

Ask who will inspect, test and issue the certificate before work starts. Request the electrician’s full name and registration details, then verify them through the appropriate official Department of Employment and Labour route or provincial electrical contracting channels. Ensure the certificate describes the actual alteration and site, and query incomplete or inconsistent details before accepting it.

Important distinction

A PV GreenCard, industry membership, product warranty or municipal submission is not a substitute for the electrical Certificate of Compliance. Requirements can differ by system design and municipality, so obtain current written guidance for your location.

Questions to send every shortlisted installer

  1. What exact equipment models will you install, and what happens if stock changes?
  2. Who is responsible for design, installation, inspection, testing and the CoC?
  3. What is excluded from the quoted total?
  4. What runtime and generation assumptions are you using?
  5. What documents and access credentials will I receive before final payment?
  6. Who handles warranty claims, and what response time is promised in writing?

Compare this checklist with our South African solar price guide and panels-versus-battery upgrade guide.

Compare itemised quotes

Do not compare totals alone. Match equipment, installation scope, paperwork, warranties and measured performance assumptions.

Start with Solar Quotes SA